Hp ProLiant ML350 G4 Server Manual de usuario Pagina 77

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 156
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 76
Hardware Options Installation 77
2. Reverse step 1 to secure the cable management arm after the maintenance
procedures have been completed.
Installing a Second Serial Port
1. Power down the server ("Powering Down the Server" on page 25).
2. Extend the server from the rack, if applicable ("Extending the Server from
the Rack" on page 26
).
3. Remove the front bezel, if applicable ("Removing the Front Bezel (Tower
Model)" on page 27
).
4. Remove the access panel ("Removing Access Panel" on page 27
).
5. Remove the expansion slot cover.
6. Install the serial port bracket and close the slot cover.
7. Connect the serial port cable to the serial port connector on the system board.
8. Replace the front bezel ("Removing the Front Bezel (Tower Model)" on page
27
), if applicable.
9. Replace the access panel ("Removing Access Panel" on page 27
).
Vista de pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 155 156

Comentarios a estos manuales

Sin comentarios