Hp ProLiant ML570 G4 Server Manual de usuario Pagina 62

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 125
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 61
Hardware options installation 62
23.
Install the processor air baffle ("Processor option" on page 38).
24. Install the access panel. ("Install the access panel" on page 27)
25. Do one of the following:
— Install and lock the bezel.
— Slide the server back into the rack.
26. Power up the server (on page 23).
Redundant hot-plug power supply option
The server supports a second hot-plug power supply to provide redundant power to the system in the
event of a failure in the primary power supply. You can install or replace a second hot-plug power supply
without powering down the server.
CAUTION: If only one power supply is installed, do not remove the power supply unless the server has
been powered down. Removing the only operational power supply will cause an immediate power loss.
NOTE: To remove the primary hot-plug power supply, remove the shipping screw under the power supply
handle. Use the T-15 Torx screwdriver ("Rear panel components" on page 9).
1. Remove the power supply blank.
Vista de pagina 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 124 125

Comentarios a estos manuales

Sin comentarios