Hp ProLiant ML570 G4 Server Manual de usuario Pagina 71

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 125
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 70
Hardware options installation 71
b.
Install six 6-32 Torx T-15 screws (three per side) into the corresponding holes on the rack bezel.
8. Install the server into the rack ("Installing the server into the rack" on page 34).
Rack-to-tower conversion
The rack-to-tower conversion kit includes all equipment required to convert the rack model server into a
tower model server.
The rack-to-tower conversion kit includes:
Tower bezel
Casters (4)
Tower bezel retention clips (2)
Caster screws [8-32 Torx T-15 (12)]
Tower cover screws [6-32 x 1/4 Torx T-15 (2)]
Painted access panel
In addition to the items supplied in the conversion kit, use the Torx T-15 screwdriver ("Rear panel
components" on page 9).
Before proceeding with the rack-to-tower conversion:
1. Power down the server (on page 23).
2. Disconnect the power supply cables ("Redundant hot-plug power supply option" on page 62).
3. Disconnect all external cables from the server rear panel ("Rear panel components" on page 9).
4. Remove all cables from the cable management arm.
5. Remove all power supplies from the server (to decrease the weight) ("Redundant hot-plug power
supply option" on page 62).
6. Remove all hard drives from the server (to decrease the weight) ("Removing a hot-plug SAS hard
drive" on page 56).