
(Optional) Sensor Base Stations 59
• Ct1 = 200
• Ct2 = 5
Programming the digital out
1. Set the following values.
Digital out ION setting
out1
Tc1
NOTE: You cannot verify the CT polarity if you are in the Direct Delta voltage mode. To verify the
CT polarity, temporarily switch the meter to 4W mode. After the polarity is verified, switch back to
mode. For more information, see Programming the voltage mode (on page 58).
2. Verify the CT polarity by reading the current phase values.
If the polarity is backwards, then the - light is on for each CT. Return to the programming mode and
change CPL1, CPL2, and CPL3 to inv. The polarity is automatically reversed, as if you reversed the
black and white wires.
Programming Modbus communication
The ION6200 Energy Meter supports 2wire with shielded RS-485 connection. You can connect multiple
meters (up to 32) in a daisy chain series, in which case, the last meter of the series must have the terminating
resistor installed. For more information, see Installing the HP 480V/200A-600A Energy Base Station.
Programming the Modbus ID
1. Set the protocol to Modbus (Mod).
NOTE: The Modbus ID is default to 1xx, where the xx is the last two digits of the unit serial
number.
Comentarios a estos manuales