Hp ProLiant DL580 G3 Server Manual de usuario Pagina 105

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 190
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 104
Memory options 105
Removing a memory board blank
To remove the memory board blank, squeeze the levers and pull the blank out of
the server.
Removing and installing a memory board while the server is
running
Memory boards can be installed while the server is running in the following
scenarios:
Memory boards can be hot-added if the server is configured for Advanced
ECC and hot-add is enabled in RBSU.
Memory boards can be hot-replaced if the server is configured for hot-plug
mirrored memory or hot-plug RAID memory.
IMPORTANT: Be sure to power down the server when performing
board removal procedures in a server that is not configured for
Advanced ECC, hot-plug mirrored memory, or hot-plug RAID memory.
1. Unlock the locking switch, and open the release latch.
CAUTION: Only memory boards with a green Removable LED can
be removed. Do not attempt to remove any memory board with the
Removable LED off.
Vista de pagina 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 189 190

Comentarios a estos manuales

Sin comentarios