Hp Array Controller HSG V8.7 Software Manual de usuario Pagina 223

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 576
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 222
Replacement Procedures 527
Replacing the External Cache Battery Storage
Building Block
The ECB SBB can be replaced with cabinet power on or off. A single-
battery ECB SBB is shown in Figure 53 and a dual-battery ECB SBB
is shown in Figure 54.
Figure 53 Single-Battery ECB SSB Configuration
Figure 54 Dual-battery ECB SBB Configuration
1 Battery disable switch
2 Status LED
3 ECB Y cable
1 Battery disable switch
2 Status LED
3 ECB Y cable
4 Faceplate and controls for second battery
CXO5715A
CACHE
POWER
STATUS
SHUT OFF
1
3
~
2
CXO5713A
CACHE
POWER
STATUS
SHUT OFF
CACHE
POWER
STATUS
SHUT OFF
3
~
4
2
1
Vista de pagina 222
1 2 ... 218 219 220 221 222 223 224 225 226 227 228 ... 575 576

Comentarios a estos manuales

Sin comentarios