Hp Hitachi Dynamic Link Manager Software Manual de usuario Pagina 157

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 652
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 156
3. Creating an HDLM Environment
135
Then, execute the following command at the ok prompt in all nodes:
boot
Note
You must restart the host immediately after a successful upgrade installation
or re-installation has been confirmed.
8. Execute the
dlnkmgr command's view operation to display the status of the
programs.
The following shows an example of executing the command:
# /opt/DynamicLinkManager/bin/dlnkmgr view -sys
HDLM Version :
x.x.x-xx
Service Pack Version :
Load Balance : on(rr)
Support Cluster :
Elog Level : 3
Elog File Size (KB) : 9900
Number Of Elog Files : 2
Trace Level : 0
Trace File Size(KB) : 1000
Number Of Trace Files : 4
Path Health Checking : on(30)
Auto Failback : on(1)
Intermittent Error Monitor : off
HDLM Manager Ver WakeupTime
Alive
x.x.x-xx yyyy/mm/dd hh:mm:ss
HDLM Alert Driver Ver WakeupTime ElogMem Size
Alive
x.x.x-xx yyyy/mm/dd hh:mm:ss 4096
HDLM Driver Ver WakeupTime
Alive
x.x.x-xx yyyy/mm/dd hh:mm:ss
License Type Expiration
Permanent -
KAPL01001-I The HDLM command completed normally. Operation
name = view, completion time =
yyyy/mm/dd hh:mm:ss
#
The set values that were effective for each function before the update are
inherited as they are.
If you performed an upgrade installation from HDLM 05-00 or 05-01, the
load-balancing setting will remain
on if it was previously set on, and the
algorithm will be
rr (round robin). If you performed an upgrade installation
from HDLM 05-02 or later, the setting and algorithm will be inherited if the
Vista de pagina 156
1 2 ... 152 153 154 155 156 157 158 159 160 161 162 ... 651 652

Comentarios a estos manuales

Sin comentarios