
Verifying the installation
ARNING!
Before verifying the installation, make sure you have turned off the power to avoid bodily injury and
router damage.
Use the following checklist to make sure the router has been installed correctly.
Table 7 Installation checklist
Item
Result Remarks
Yes No
The grounding cable is grounded correctly.
Power supplies are installed correctly and firmly seated.
Power cables are connected correctly.
MPUs are installed correctly and have close contact with the
backplane.
LPUs and subcards are installed correctly and have close contact
with the backplane.
19
Comentarios a estos manuales